Boilers: Repair or Replace? Four Boards Solve Four Common Problems
By Alan Saly

The 40-year-old boiler at 504-510 West 110th Street in Manhattan had been giving the co-op board trouble. An inspection confirmed it should have been replaced years ago, and was only still running because of the ministrations of the building's dedicated super. But replacement posed complications: The boiler room also contained the building's condemned and unused coal-fired boiler from 1909, which would have to be dismantled. Water was seeping in via an underground stream that was slowly surfacing. And the equipment was lined with asbestos, requiring hazmat precautions.
Replace or repair? Upgrade or maintain? These are questions countless co-ops and condos face when aging boilers can bring a board to the boiling point.
Share Article 
Share Article 
Tip a Friend
Print Article
Boilers are the critical circulatory systems of buildings. With a lifespan of 30 to 60 years, your boiler may not need replacement now, but it will, and usually sooner than you'd think. Or, maybe the high cost of fuel will spur a retrofit with an electronic monitor to control temperature fluctuations. Or, perhaps you just need to do simple maintenance and cleaning.
Most boards replace boilers only as a last resort. You have to consider not only the $20,000-and-up replacement cost of the two main components — the "tea kettle," where the water is heated for circulation, and the burner (or furnace), which burns oil or gas and generates the heat that boils the water — but also the costs of disassembling and carting away the old equipment and the likely need to install a new heat timer and control panel. The total can reach a couple of hundred thousand dollars or more.
In with the New, Backing Up with the Old
In dealing with the rundown boiler at the 148-unit 504-510 West 110th Street, engineer Young Suh of Rand Engineering & Architecture devised a plan calling for the demolition of the defunct coal-fired boiler, the refurbishment of the current boiler as a backup unit, plus the installation of a new unit and the digging of trenches outfitted with sump pumps to deal with the water in the basement. To increase boiler efficiency, Suh recommended that the five dozen or so two-inch tubes that bring heat from the burner into the boiler's water tank be cleaned of the soot that had lined them during normal operation. Since the old boiler would now be used only as a backup, he didn't recommend a burner replacement, which could have cost $10,000.
The price of the job was projected to be around $300,000. The board requested bids from three boiler-installation companies in October 2007, and the project was well under way when shareholders met in November for their annual meeting.
The seven-member board liked Suh's approach, says David Estrin, the president, because "he didn't seem to be telling us what he thought we wanted to hear." The directors picked the winning bidder on the boiler job, Controlled Combustion, for similar reasons. "They seemed to be less positive," Estrin says. "The other firm we considered said that everything was going to be perfect, and we knew it likely wouldn't be." By contrast, says Estrin, Controlled Combustion was matter-of-fact about possible problems and direct about how it would handle them.
Today, the co-op's new boiler is in place and running, a trench has been dug, sump pumps have been installed and the old boiler is being renovated. The board is "ecstatic" about how work has progressed. Suh has written 11 progress reports to the board, which Estrin describes as "a very cohesive unit."
Interest-Free Loan
To repair or replace became an issue at the 65-unit Nameoke Court Condominium in Far Rockaway, Queens. There the board knew it had to replace an antiquated, 1960s boiler system that featured a series of boilers operating in tandem. Observes board president Mark Wiseman, "It was a poor design and a poor application."
Steve Greenbaum, director of management at Mark Greenberg Realty, says Nameoke Court had another problem: "The building was in real financial hardship; they just didn't have any money." What it did have was being wasted on repairs and ongoing violations. "We had a ton of shutdowns, and when we did have the boiler [system] running it overheated the building. … The board refused to raise common charges, so there was nothing we could do except try to get a loan, which looked impossible."
Despite all this, the board and Greenbaum eventually landed a five-year, interest-free loan option from KeySpan. The Brooklyn boiler-installation firm Abilene replaced the burner, keeping the "tea kettle," and converted from oil to gas heat. The board hired engineer Ronald Krigsman of Lawrence, N.Y., to supervise the work and draw up design specs.
The new system at Nameoke, says Krigsman, "is controlled by one overall unit that senses when heating has started and that also senses the heat of the water on its return to the boiler." The boiler cycles on and off depending on the desired temperature of the circulating water.
Comments
Log in or create a user account to comment.
A Video Roundup of Our June Issue!
Green Retrofitting
A Manager Goes Green
Quality Contractors, Part 1: Choosing
Biofuel Basics
The Three Types of Heating Oil
Heating-Oil Scams
Older Buildings and LEED Certification
Using Energy Brokers
Going Green on the Cheap
Hot Topics at 2008 Annual Meetings
Geothermal Energy
Solar Power DIY
Heat Balance
What is NYSERDA?
Electricity Submetering
Bitron Video Intercom
Floodgate Installation: One Kensington Gate
Apartment Access: A Key Issue
Virtual Concierge: The Knickerbocker Lofts
Laundry Room Coinless Card Systems
Microturbines
Flash-Flood Fix
Bulk-Subscription TV
Point-and-Click Payment
Learn from your peers by posing questions in the Habitat Board Talk Forums.
Apropos of CIRA, may I suggest some simple rules?
1. President does not sign checks, e.g. not authorized.
2. President does not... more
CIRA booklet
I, and many of our board members, tend to agree with...more
Posted by: Manhattan President, 32 units
09/06/2008 01:21 pm
We embarked on a project to replace all the old corroded plumbing risers. NYC regulations require abatement of asbestos if more than a certain amount Read More »
Posted by: Brooklyn President, 75 units
09/04/2008 12:32 pm
It gives me great pleasure to use this forum within which to share my experience as Board President of a 75 unit Brooklyn-based converted co-op. I hope Read More »
Learn all the basics of being a board-member, straight from our baker's-dozen movers and shakers.
2008 Source Guide
Be sure to check out our 2008 Source Guide – chock-full of great resources for your board. It is available online, and you can also get your organization listed as a provider.
September 2008
Building champions, lobby renovations, and our 12th annual attorney survey! See this month's contents >>
Your Go-To Place! Use Our Annual Directory of Suppliers, Vendors, Property Managers, Real-Estate Professionals and More to Find Everything You Need! Go for it »






Add comment